PetroChina 81 Natural Gas Station Fire Fighting Equipment Facilities Relying on the Feasibility Evaluation Project

PetroChina 81 Natural Gas Station Fire Fighting Equipment Facilities Relying on the Feasibility Evaluation Project
  • Project location Karamay City

Project Introduction

Because the design unit cannot determine the feasibility of its preliminary design scheme, the existing fire equipment and facilities, the regulatory compliance and feasibility of the water supply system, the professional fire technology assessment agency needs to be in -depth judgment.The project team selects the representative fire water consumption area for calculation, determines the total amount of water for fire protection, and combines the compliance with the actual needs in combination with the strength of the supply strength of the foam liquid to demonstrate the feasibility of the deep -cold efficiency project.In addition, the evaluation of on -site inspections, inspection materials, and comparison review methods is used for compliance assessment in the standard of standardization.The “Special Evaluation Report” issued the expert review meeting only once, and the professional suggestions and countermeasures proposed in the report were adopted by Party A.